Short answer
The reorder point is the stock level at which you need to order more. You calculate it by multiplying your average daily sales by the days the replenishment takes to arrive and adding safety stock. Safety stock is the reserve that covers higher-than-normal sales or a supplier delay. Both are calculated per product and reviewed when sales or lead time change.
Key points
- Reorder point = average daily sales x lead time + safety stock.
- Safety stock covers two risks: selling more than expected and a late replenishment.
- It is calculated per product, not for the whole catalog.
- Recalculate before every peak date and when you change supplier.
The concepts you need
| Concept | What it is |
|---|---|
| Average daily sales | Units sold in a period divided by the days in that period. |
| Lead time | Days between placing the order with the supplier and the stock being available to sell. |
| Safety stock | A reserve to cover higher-than-expected sales or a late replenishment. |
| Reorder point | The stock level at which a new order has to be placed. |
| Days of cover | Days the current stock lasts at the average sales rate. |
| Stockout | The moment a product runs out and cannot be sold. |
Lead time includes the time the warehouse takes to receive and locate the goods, not just the trip from the supplier.
The formulas, with an example
Safety stock = (maximum daily sales x maximum lead time) − (average daily sales x average lead time)
Reorder point = average daily sales x average lead time + safety stock
Days of cover = available stock ÷ average daily sales
| Data | Example value |
|---|---|
| Average daily sales | 20 units |
| Maximum daily sales | 35 units |
| Average lead time | 10 days |
| Maximum lead time | 15 days |
| Safety stock | (35 x 15) − (20 x 10) = 325 units |
| Reorder point | (20 x 10) + 325 = 525 units |
In the example, when stock drops to 525 units it is time to order. This method is conservative: it assumes the highest sales and the longest lead time happen at the same time.
A finer method: service level
If you have your daily sales history, you can calculate safety stock from the real variation in your sales and the service level you want to offer. Service level is the probability of not running out of stock while the replenishment is on its way.
Safety stock = Z x standard deviation of daily sales x square root of the lead time in days
This version assumes lead time does not vary. If it varies a lot, use the previous method or add margin days.
| Service level | Z value |
|---|---|
| 90% | 1.28 |
| 95% | 1.65 |
| 99% | 2.33 |
Example: with a standard deviation of 6 units a day, a 10-day lead time and a 95% service level, safety stock is 1.65 x 6 x 3.16 = 32 units, rounding up.
Not every product deserves the same reserve
- A products. The few that concentrate most of your sales. High service level and weekly review.
- B products. Medium sales. Review every two weeks or monthly.
- C products. Low or irregular sales. A small reserve, or sell to order.
- Products with an expiry date. The reserve has a ceiling: what you can sell before the date.
- New products. With no history, start from a similar product and adjust after a few weeks.
How to define your reorder points
Export your sales by product
At least three months, day by day, leaving out the days the product was out of stock.
Measure each supplier's real lead time
From the purchase order until the stock was available, over the latest replenishments.
Classify your products
Sort them by sales and separate A, B and C.
Calculate safety stock and reorder point
With one of the two formulas, product by product, starting with the A group.
Load the reorder point as minimum stock
In your system or your spreadsheet, so it alerts you when a product reaches that level.
Review every month
And before every event, supplier change or change of season.
If you do not have a system yet, the stock control spreadsheet lets you record the minimum stock per product.
Several channels and peak dates
- A single stock for all channels. If each channel has its own reserve, you need more total stock. The guide on connecting your sales channels explains how to sync it.
- Separate stock in a marketplace. What you send to a marketplace's warehouse is not available for your own store. Calculate its reorder point separately.
- Events. Before a Cyber event, use the daily sales of the previous event and not the yearly average. The guide on how to prepare your logistics for Cyber events and Christmas has the calendar.
Frequently asked questions
What is safety stock?
It is the reserve of units you keep to cover higher-than-expected sales or a late replenishment. It prevents you from running out while the next order arrives.
How is the reorder point calculated?
Multiply your average daily sales by the days the replenishment takes and add safety stock. With 20 units a day, a 10-day lead time and a 325-unit reserve, the reorder point is 525 units.
How much safety stock should I hold?
It depends on how much your sales vary, how late your supplier tends to be and the service level you want to offer. There is no single number: it is calculated per product with one of the formulas in this guide.
How often should I recalculate?
Once a month for your best-selling products, and always before an event, a change of season or a change of supplier.
What is a stockout?
It is the moment a product runs out and is no longer available for sale. Every day without stock is a sale that does not happen.